Intersection track area with headshunt behind Nizhegorodskaya Ulitsa station. Pit shoring structure construction in the area from Nizhegorodskaya Ulitsa station to intersection track area.

The start of construction
2015

Project
in numbers

  • work type
    Slurry wall construction
  • Volume of SW concreting
    40 000 m3
  • Depth of shoring structure
    34 m
  • Trench width
    0.8 m, 1 m